Two parallel tracks toward EAP scientific validation. Click any segment to explore its scope, responsibilities, and connection to the 15 Questions.
Shared questions (Q2, Q8, Q10) require both tracks working in concert — theoretical articulation from Track A and documented evidence from Track B. Neither track alone can answer these fully. Track B Stage 3 evidence feeds directly into the Track A Stage 2 EAP submission.
Governance milestones for monitoring progress across both tracks. Click any segment to view the full milestone detail, timeline, and dependencies.
Milestone B3.3 — the first peer-reviewed publication — is the most time-consuming and least controllable milestone on the entire roadmap. Review cycles are unpredictable; rejection and resubmission should be planned for. The Board should treat peer-reviewed publication as a quality aspiration, not a gate that blocks the EWO submission. The EAP accepts case studies, internal documents, and preliminary studies as valid evidence. The EWO application can proceed with the existing evidence base — the Jones dissertation, the von Blumenthal poster, and the Beltran-Salanguit study — supplemented by the theoretical framework from Track A Stage 1. Publication strengthens the application. It does not need to delay it.
Shared milestones (A2.2 + B3.4): The EWO application package and the evidence assembly happen in concert. Both leads must coordinate timing so that Track B evidence is ready when Track A submits. M = month of Board mandate. All timelines are indicative; the full cycle to EWO status is realistically 4 to 6 years from Board mandate.